PAPA TERRA
A Turnkey Solution for Brazilian Waters
As Brazil’s first TLWP the P-61 was engineered, procured, constructed, installed and operated on time and within budget. The technical solution included complex analyses to assure safe operation with a Tender Assisted Drilling (TAD) rig as well as permanent flowlines to the P-63 FPSO. Our engineers and project team members supported the project with no lost time incidents and in full compliance with Brazilian regulations. The hull and topsides were successfully integrated by float-over using a custom designed barge.